Service Description
- Switchgear and protection systems
- Design and installation of distribution boards, transformers, minisubs, power cables, standby generators & UPS systems
- Earthing & lightning protection systems
- Testing & commissioning, Electrical Certificates of Compliance (CoC’s)
Client | Service Description | Status |
---|---|---|
Eskom Holdings (SOC) Ltd | Appointment of a contractor for electrical repairs required to bring Unit 2 back into operation from an outage at Duvha Power Station | Active |
Coca Cola Beverages South Africa (Pty) Ltd | PTA Line 8 Project: Electrical installation and services required at the CCBSA Pretoria Manufacturing Plant | Completed |
TSK Bartlett (Pty) Ltd | Supply, install, test and commission electrical infrastructure for new facilities at CCBSA Clayville plant | Completed |
TSK Bartlett (Pty) Ltd | Supply, install, test and commission electrical Infrastructure for new facilities at the Coca Cola plant in Polokwane | Completed |
Coca Cola Beverages South Africa (Pty) Ltd | Design, manufacture, supply, install, test and commission all electrical equipment including power cables, cable trays, distribution boards and new accessories required to supply new forklift charging stations at CCBSA Polokwane and Premier plants | Completed |
Sentech (SOC) Ltd | The appointment of electrical contractors on a panel of pre - qualified service providers for electrical infrastructure upgrade at various Sentech Transmitter Stations on an as and when required basis for a three-year period | Completed |
ERWAT (SOC) Ltd | Design, Supply, Delivery, Installation and Commission ing of Module 1 Aerator Cabling | Completed |
Afrisam (Pty) Ltd | Replacement of Busbar B SF6 at Ulco Cement Factory | Active |
Ephraim Mogale Local | Supply and replace 440m old XLPE cable from 713 to 561 in Ext 5 | Completed |
Ephraim Mogale Local | Supply and installation of a 740m PILC, 11kV Cables in Ext 5 | Completed |
Eskom Holdings (SOC) Ltd | Unit 4 LV circuit breaker replacement at Duvha Power Station | Completed |
Gateway Airport Authority Limited | Appointment of service providers for Electrical services for a period of 36 months | Active |